Subcontracts = 32
Man hours = 197,000 (almost 9 hrs per person living in Hutchinson County per 2010 Census)
Average Work hours per day = 540 (335 contract duration + 30 day punch list)
Average Workers per day = 63
Excavation = 72,000 cy (rock & dirt)
Concrete = 5,183 cy (enough to cover a football field, 2.5 lf high)
Drywall (interior & exterior) = 382,500 square foot total (would cover over 6.5 football fields)
Finishes
Vinyl Wall covering = 31,000 square feet–enough to cover 5 ½ 747 wings
Acoustical Ceilings = 54,050 square feet– The size of a Wal-Mart
Countertop/Cabinet Decorative Laminate = 20,632 square feet1’ wide strip for almost 4 miles
Doors = 385-Enough to enter 385 rooms.
Mechanical / Plumbing
Piping = 70,000 lf (contains 18,000 gallons water)
Ductwork = 105,000 lbs sheet metal (total of about 30 average sized cars)
Rooftop Air Handling Units can produce close to 100,000 CFM air flow (enough to fill 71 hot air balloons every hour)
Electrical
Conduit = 57,000 lf (10.8 miles) Get you to Fritch
Wire = 597,200 lf (113.1 miles – equivalent of traveling to Amarillo airport and back)
Receptacles = 1,290to fill a box big enough to hold 1,290 receptacles
Switches / Sensors = 670. You add these numbers up, they equal 13
Fluorescent Lamps = 3,075
Generator – 1 Megawatt emergency backup produces enough electricity to power 40 avg. sized homes
|