Pink Ribbon Facility
Golden Plains Community Hospital
banner
 


Become a Facebook Fan

Fun facts about your new hospital.

 

Subcontracts = 32

Man hours = 197,000 (almost 9 hrs per person living in Hutchinson County per 2010 Census)

Average Work hours per day = 540 (335 contract duration + 30 day punch list)

Average Workers per day = 63

Excavation = 72,000 cy (rock & dirt)

Concrete = 5,183 cy (enough to cover a football field, 2.5 lf high)

Drywall (interior & exterior) = 382,500 square foot total (would cover over 6.5 football fields)

 

Finishes

Vinyl Wall covering = 31,000 square feet–enough to cover 5 ½ 747 wings

Acoustical Ceilings = 54,050 square feet– The size of a Wal-Mart

Countertop/Cabinet Decorative Laminate = 20,632  square feet1’ wide strip for almost 4 miles

Doors = 385-Enough to enter 385 rooms.

 

Mechanical / Plumbing

Piping = 70,000 lf (contains 18,000 gallons water)

Ductwork = 105,000 lbs sheet metal (total of about 30 average sized cars)

Rooftop Air Handling Units can produce close to 100,000 CFM air flow (enough to fill 71 hot air balloons every hour)

 

Electrical

Conduit = 57,000 lf (10.8 miles) Get you to Fritch

Wire = 597,200 lf (113.1 miles – equivalent of traveling to Amarillo airport and back)

Receptacles = 1,290to fill a box big enough to hold 1,290 receptacles

Switches / Sensors = 670. You add these numbers up, they equal 13

Fluorescent Lamps = 3,075

Generator – 1 Megawatt emergency backup produces enough electricity to power 40 avg. sized homes


 
 
Medical Dictionary
medical dictionary search provided by MediLexicon.com
 
100 Medical Drive, Borger, TX 79007, (806) 467-5700
On Time Technology Solutions, Inc.
Designed and Powered by:

Copyright © 2009-2011 / www.GoldenPlains.org